Tuesday, April 24, 2007

Roof Profile Takes Shape

This is a view from my deck. It looks like it starting to come together. Now I just have to get the shingles delived tomorrow and I could get that off the check list.



The original plans called for a 2 foot overhang. I decided to cut it down to 1 foot because I want to copy the overhang design on my house when i'm ready to do that part of my project. If I put 2 foot overhangs on the house it would not look that good. I consulted two designers, my builder, my mother, two friends, and a neighbor. They all said the 1 foot design was the way to go.


Even though I went with a 1 foot overhang I like the extra long rafter tail in the front & back. I may cut a design into them but I'm debating which design to use. I have 9 of them to pick from.

Saturday, April 21, 2007

Framing Begins



It took a few days for the weather to clear up and I had a ton of snow on the ground. It's starting to look like early spring. The weather is now normal. and we in for a few sunny days in a row. The guys got a lot of work done in two days. The garage bays are 9x8 and I have 9 foot ceilings. Hopefully the framing will be done this week and by the end of the 1st week of May I could have this rapped up. I am meeting with a contractor that my uncle told me about to pour a new cement driveway because with all the heavy trucks coming in and out of the property they destroyed the 55 year old driveway that was there. The new one will be 11 foot wide where the old one is 8 foot wide.

Thursday, April 12, 2007

Mini Pool or Garage Floor ??



Not too much has happened for the past week. It snowed for five straight days. As you can see I have a mini pool for a garage floor. When I measured the snow before it melted I had 30 inches on the ground. I with I had taken a picture this morning because I had one duck and two geese swimming in there. Hopefully the weather will turn better over the next few days so we could start building again. I may have to pump the water out so it dries out faster.

Saturday, April 7, 2007

New Garage Footers


The concrete foundation was removed and the footers were dug out. New ones were put in place and looks like there is no turning back now.

Corner of the where the new concrete footers will be poured.



















Once the garage came down and everything got cleaned up we decided to move the garage back five feet from where it was originally. This way I could get 2 cars in and out comfortably. It will be a 24 x 24 design with 2 door bays. Each door will be 9x8. The original design has 8x8 doors but I have a 2007 Ford F-150 4x4 so the bigger door will not cause a problem with me getting in and out. This is where I am up to this point. We have been getting pounded with a snow storm for the past two days so the project is on hold until the weather passes.

Garage Demo

Tony (right) and friend love to do demo work. Looks like they had fun today.

March 29, 2007: Today is the day the old garage came down. It cost $400 for a 40 yard dumpster and $200 for Tony & a friend to tear it down. They had it in the dumpster in 5 hours. I was a little nervous because once it came down there was no turning back. I was commited.




New Garage Project


March 28, 2007: After three years of planning what I was going to do with my house I have finally made the decision to start phase I of this project. The new garage design was to originally be a 2 story two car garage. I got the city of South Euclid to approve the variances for height and square footage in October 2006. What was not expected was the price of lumber. It was $4,526.00 more than what was quoted to me 8 months prior. Being disappointed with the increase I decided to make a new design for a 1 story 2 car garage with the option to expand for a second story later. Here is what the old garage looked like inside and out. It was built in 1952.


Friday, April 6, 2007

Time To Start The Project


Welcome to my blog. I have done several remodeling projects in the past and this will be the first one that the progress will be posted online. I bought my home in April 2004 with the anticipation of fixing it up. This house is like the other 10,000 you could find in Cleveland. It's your typical post World War II home.
My goal is to transform a cookie cutter home from the early 1950's and make it the best looking home on the street. I live in an area where there are many early style bungalows. This remodel will focus on taking a post World War II home that you could find just about anywhere around my area and transforming it into a unique place. Hopefully it will work out but you never know unless you give it a shot.